2022-07-17 12:28
KS
AI CHS Solution
🚢 Departure
Gladstone LNG Terminal
Date/Time2022-07-03 10:01
Tank Pressure1.22 bar
Cargo Volume172,000 m³
Temperature-161.5 °C
Voyage Summary
🚢
5,260
nautical miles
Expected Distance
20.0
days
Duration
13.2
knots
Avg Speed
🏁 Arrival
Caofeidan LNG Terminal
Date/Time2022-07-29 10:01
Tank Pressure1.25 bar
Expected Cargo170,850 m³
Temperature-160.8 °C
Voyage Progress 60%
Gladstone (Jul 03) Current Position (Jul 17) Caofeidan (Jul 29)
CHS Solution Result
Total Cargo Consumption
651
m³ / voyage
Total GCU Operation
128.4
ton
Total Reliquefaction
94.7
ton
Total BOR
0.082
% / day